国产重口老太和小伙乱,国产精品久久久久影院嫩草,国产精品爽爽v在线观看无码 ,国产精品无码免费专区午夜,国产午夜福利100集发布

 
 

Home/Our Business/Equipment Installation

Electromechanical Equipment Installation at the Ertan Hydropower Station (China)

Updated: 2014-04-01

The 550MW water-turbine generator units at the Ertan Hydropower Station had the largest single-unit capacity in China in the twentieth century. The consortium led by CGGC installed as many as four 550MW units for one single hydropower station in one installation workshop within one year, creating a national record in this field.

Electromechanical Equipment Installation at the Ertan Hydropower Station (China)

Electromechanical Equipment Installation at the Ertan Hydropower Station

 

 

Links Privacy Statement Terms of Use Contact Us

Copyright@2013 China Gezhouba (Group) Corporation. All rights reserved.