国产重口老太和小伙乱,国产精品久久久久影院嫩草,国产精品爽爽v在线观看无码 ,国产精品无码免费专区午夜,国产午夜福利100集发布

 
 

Home/News

CEEC begins to repair Dunai Dam in Angola

Updated: 2013-09-05

Aug 28 saw the commencement of CEEC-contracted repair of the Dunai River Dam in Benguela province, Angola.

The project is on the Dunai River in the suburb of Cubal city, Benguela province. Scheduled to be completed within 6 months, its main construction work includes dam reconstruction, repair of water-intake structures, river course clean-up, etc.

After the project is completed, the dam’s water diversion tunnel will be approximately 5 kilometers in length and will be connected to the diversion channel, through which river water will flow directly to Benguela to provide production water and domestic water for the urban area.

 

Links Privacy Statement Terms of Use Contact Us

Copyright@2013 China Gezhouba (Group) Corporation. All rights reserved.